Package Reports
Package the report directory, <studyDir>/rpt/…, in a .zip file.
The top level directory in a study is <studyDir>. Once an approach is created, a secondary subdirectory, <studyDir>/rpt, is created for reports. Each approach then has its own subdirectory within the rpt directory.
-
Do one of the following:
- From the Study ribbon, Collaborate tool group, click the
Report tool.
Figure 1.
- From the menu bar, click .
The Save As dialog opens.Important: If you open the Save As dialog using the File menu, verify that Reports package (*.zip) is selected for Save as type. - From the Study ribbon, Collaborate tool group, click the
Report tool.
- Navigate to your working directory.
- In the File name field, enter a name for the packaged report.
- Click Save.